Site Preparation & Excavation
We excavate the area to a depth of approximately 12 inches to remove existing soil and prepare the ground for a solid foundation.
Sub-Base Installation
A strong MOT Type 1 sub-base foundation is installed and compacted using professional machinery to create a stable base for the driveway.
Sharp sand layer for perfect levelling
A layer of sharp sand is spread over the compacted sub-base and carefully hand-screeded to precise levels, creating a smooth and even surface ready for paving installation.
Block paving installation
The selected paving blocks or stones are carefully laid in the chosen pattern to achieve the desired design.
Joint sanding and finishing
The surface is compacted using a vibrating plate and kiln-dried sand is brushed into the joints to lock the blocks securely in place.